| Using A Volt Indicator |
|
|
| Use of Volt Indicator to confirm a power source |
| Using A Volt Proving Unit |
|
|
| Bob Multi-meter proving test before live panel work |
| Live Panel Voltage Testing |
|
|
| Matt doing a phase to earth volt test in a live panel |
| Live Panel Voltage Testing |
|
|
| Neale Phase to Phase Volt test in a live panel. |
| Amp Testing in a plant control panel |
|
|
| Scott carrying out an Amp test to confirm balance across all 3 phases. |
 |
 |
| Motor Insulation Test |
|
|
| Bob carrying out a phase to earth Insulation test on a motor winding. |
| Motor Insulation Test |
|
|
| Matt & Paul carrying out an Insulation test between two windings on a motor |
| Preparing for an Earth Loop confirmation test |
|
|
| Keith linking up the phases in a Motor ready to carry out a PE loop test. |
| Motor ready for a PE Loop test. |
|
|
| Bob has linked out the motor to simulate a earth fault, ready for PE loop test |
| Protective Earth Loop Test |
|
|
| Bob carrying out a PE test in a control panel to ensure the unit is safe before turning it back on. |
 |